Players list Checked In sorting does not change order
Source: Featurebase post 6a20b0d898f1621c6455b383 (Sorting by "Checked In") from Game H / gamehavenmd@gmail.com, 1 upvote.
User report: "This option doesnt actually work. Every time i click it, nothing changes."
PM triage:
- Problem: event organizers appear to have a Checked In sort option in the player/registration list, but using it does not visibly reorder the list.
- Evidence: one Featurebase report; no event ID, page URL, browser, or screenshot yet.
- Current workaround: manually scan the list instead of sorting by check-in state.
- 90/10: make the existing Checked In sort control reorder deterministically by check-in status without breaking the existing player list behavior.
Needs reproduction details before backlog acceptance:
- Event link/ID and game/program.
- Exact page/table where the sort is clicked.
- Expected order vs actual order, with screenshot or short recording if possible.
Log in to comment and vote
No comments yet
Be the first to share your thoughts.